-
A4000284 Grantleigh Cabinet
Delivery timing 4 to 6 weeks.
- Made of veneer, solid and engineered wood and metal
- Dark brown finish
- Goldtone metal door pulls
- 2 doors
- 1 adjustable shelf
- 2 wine racks (16 bottles)
- Wine glass holder (27 standard wine glasses)
- Assembly required
$1,134.57A4000284 Grantleigh Cabinet
$1,134.57 -
A4000269 Deanford Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and engineered wood
- Antique white finish
- 4 doors with glass panel door fronts
- Pewter-tone metal door pulls
- 6 shelves
- Assembly required
$1,221.22A4000269 Deanford Cabinet
$1,221.22 -
A4000268 Roranville Cabinet
Delivery timing 4 to 6 weeks.
- Made of veneer, wood and engineered wood
- Antique white and brown finish
- 4 doors
- 2 adjustable shelves
- Bronze-tone metal door pulls
- Assembly required
$1,052.06A4000268 Roranville Cabinet
$1,052.06 -
A4000267 Gabinwell Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and engineered wood
- Light and medium brown finish
- Diamond inlay pattern door fronts
- Black door pulls
- 2 doors
- 2 shelves
- Assembly required
$1,344.98A4000267 Gabinwell Cabinet
$1,344.98 -
A4000266 Dorvale Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and engineered wood
- Light and medium brown finish
- Antiqued goldtone hardware
- Starburst patterned door front
- Interior shelf
- Assembly required
$379.56A4000266 Dorvale Cabinet
$379.56 -
A4000260 Brentburn Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and engineered wood
- Black finish
- Brass-tone finished metal legs
- 3 doors with brass inlay accents
- 2 shelves
- Assembly required
$1,262.46A4000260 Brentburn Cabinet
$1,262.46 -
A4000259 Graydon Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood
- Antique gray finish
- Rough sawn plank doors with gunmetal finished hardware
- 4 doors and 2 shelves
- Metal legs
- Assembly required
$1,262.46A4000259 Graydon Cabinet
$1,262.46 -
A4000258 Kerrings Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and engineered wood
- Natural, black and ivory finishes
- 3 doors with geometric carving and black metal knobs
- 3 shelves
- Assembly required
$1,262.46A4000258 Kerrings Cabinet
$1,262.46 -
A4000252 Premridge Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood, engineered wood and metal
- Antique gray finish and black finished metal
- 2 doors with diamond inlay pattern and wooden pulls
- 2 slotted shelves hold 16 bottles
- Rack holds 27 stemmed glasses
- Adjustable shelf
- Assembly required
$1,134.57A4000252 Premridge Cabinet
$1,134.57 -
A4000244 Graybourne Cabinet
Delivery timing 4 to 6 weeks.
- Made of veneer, wood and engineered wood
- White faux marble top
- 3 doors with glass panel fronts
- 3 adjustable glass shelves
- Cutout for wire management
- Assembly required
$1,052.06A4000244 Graybourne Cabinet
$1,052.06 -
A4000235 Lamoney Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and engineered wood
- Distressed brown, gray and white finish
- 2 drawers
- Single cabinet
- Lower shelf
- Black finished metal base and hardware
- Assembly required
$548.71A4000235 Lamoney Cabinet
$548.71 -
A4000227 Beckings Cabinet
Delivery timing 4 to 6 weeks.
- Made of wood and veneer
- Antique brown finish
- Bronze-tone finished metal door pulls
- Woven paneled fronts
- 2 doors
- Adjustable shelf
- Assembly required
$548.71A4000227 Beckings Cabinet
$548.71